Victory Garden Drive Sidewalk Improvements
The Victory Garden Drive Sidewalk Improvements project will provide a new sidewalk and traffic calming along Victory Garden Drive from Apalachee Parkway to Park Avenue.
Construction on these improvements began July 8, 2024. The design includes a 6-foot-wide sidewalk with a sodded separation from the road along the west side of the roadway.
Project Details
Project Goal
- Provide increased pedestrian connectivity along Victory Garden Drive from Apalachee Parkway to Park Avenue
- Slow down speeding vehicles
Typical Section
- Six-foot-wide sidewalk with separation from the roadway
- Street trees where possible
- Enclose existing drainage ditch on one side (west side) of the roadway
Project Schedule
- Design: Complete in Spring 2024
- Construction: Began in July 2024
- Project Completion: Anticipated to finish in Spring 2025
Project Exhibits
Click each graphic to view a larger version
Typical Section:

Concept 1 of 2:

Concept 2 of 2:
Questions or Concerns
Contact:
Randy Lane, PE
Program Engineer, Underground Utilities & Public Infrastructure
Randy.Lane@Talgov.com
850-891-2857